How to build a gable roof for the conventional housing

Technology and the process of installing of a gable roof is considered to be the simplest of all structural solutions. An important point is that this type of a roof is diverse and there is no necessity to conduct building according to a certain standard draft. When planning how to build a gable roof you should know that there are several types of gable roofs: with different slopes, with wide gable-end and overhang construction.

Gabled roof is regarded to be the most practical design. The snow slides off this roof under its own weight, and it is protected from the stagnation of water in summer.

What are major advantages of choosing this type of roof?

How to build a gable roof

  • Slight load on the foundation.
  • Low cost of the roofing.
  • You don’t need help of the experts.
  • No negotiation with the architect.
  • Additional living space.
  • No special equipment.

The gable roof design is planned in order not only to withstand wind gust and weight of the fallen snow, but also to evenly spread and convey the roof pressure on the walls and the house foundation.

Step by step construction of the gable roof

1. Make the lathing

Type of the lathing depends on the aim of the roof. For metal tiles sparse lathing will be suitable, but for bituminous tiles solid lathing will do.

2. Make a truss system

The design of a simple gable roofCompile the rafters on the ground, and then raise the prepared sections upwards. Each section is fixed to the wall plate. Start with the two outer sections, and align all the middle sections according to them. Other parts, i.e. overhangs, pillars, beams, ridge and so on are installed afterwards as additional elements.

Usually, the rafters are made of trimmed boards of at least 2x6 inches. The wall plate is made of wooden beam of 6x6 inches. For longitudinal beams and adjacent props all boards of 2x6 inches size are allocated, but double only.

3. Fasten the wall plate

Fasten the wall plate securely as all the roof structure will lean on it. Lay the waterproofing between the wall plate and the wall. As a waterproofing you may use the roofing felt. Roof trusses must be nailed to the wall plate with screws at a slant.

4. Mount the ridge

Install the ridge beam consisting of two bars. Mounting of the ridge is conducted after waterproofing. If the width of the rafters’ props is more than 21 ft, apply the method with the slanting rafters. This method is more complicated than installation with hanging rafters, as it requires using intermediate props and an additional ridge.

Basic requirements for the gable roof

How to extend gable end roof overhangThere are some rules in regard to how to build a gable roof which will stand for many years.

  • The roof must be made only of light roofing material.
  • Insulation is the main feature of the attic roof construction.
  • Lay the insulation layer on both sides. Waterproofing of the roof begins with laying the waterproofing material from the outer side, and then the vapor barrier is installed from inside.

Principles of insulating a gable roof

Planning how to frame a gable roof that will be a reliable protection from temperature changes take care of proper insulation and waterproof system. Laying waterproofing materials (vapor barrier and insulation) in the correct order you can achieve a result that the house will be warm and dry for years.

First you need to lay the vapor barrier pressing it to the rafters by the nailing strips. Mineral wool or any other insulation of similar properties is laid from above.

Waterproofing that covers the insulation is fastened under the lathing and the roofing material actually is placed on top.

How to extend gable end roof overhang

Proper installation of a gable roof of a private houseFor the arrangement of the gable end overhang for the standard roof, you lengthen the ridge beam beyond the facade for previously verified length using cut rafters. Then, load-bearing roof beams fixed to the trusses are extended in the same way.

After that you should fix the cornice board to the end sides of the ridge and the load-bearing beams. You may do without nailing the eaves of the front overhang with soffits. But to improve the favorable appearance of the house, it’s still recommended to install the soffits.

This approach provides guaranteed protection of space under the cornice from blowing rain water. The outriggers must ultimately define a gap that will provide penetration of fresh air in the roof space.

When mounting the side eaves roofing beams are to be released beyond the outer wall plane. Outriggers’ length depends in this case on the width of the blind area of the foundation and height of the building. After laying the roofing material you proceed to fixing the ends of the beams. You may use plank binding.

As a result, you obtain a box with a horizontal lower part. Then you can move on to decorating boxes.

You might be interested in:

The important information about the basic types of roofing materials
The technology of how to install clay roof tiles
All steps description of how to replace a roof tile
Opening secrets of how to build a slanted shed roof
How to cut metal roofing when carrying out independent building
How to build a gambrel roof for dwelling and household buildings